background image
 
Die Mühlenkopfschanze
Deutsch (DE-CH-AT)English (United Kingdom)Nederlands - nl-NL
  • Jetzt neu - Impressionen über Gästeschießen und Führung unter Media
  • In der Zeit vom 7.11. bis 16.12.2016 ist die Standseilbahn wegen Revisionsarbeiten montags bis freitags geschlossen. In dieser Zeit fährt die Bahn nur an den Wochenenden von 10.00 bis 16.45 Uhr.
EWF-Biathlon-Arena

After the construction of the 2.5 km long lighted roller ski facility in 1997, in 2001, it was enlarged to 15 shooting stands for small bore and now offers cross-country skiers nd biathletes optimal training conditions in summer and winter times.

In 2007 another ten shooting ranges and a functional building of prefabricated house manufacturer Fingerhaus were built to be able to host competitions. The functional building of the EWF-Biathlon-Arena was designed for team meetings, storage and comes up with sanitary and locker rooms.

We would like to emphasize the special window solution all-round the building. Judges are now enabled to overlook many parts of the track. To guarantee best training and competition conditions, in 2009 investments were again made in an artificial snow system. It is now possible to cover the whole track with artificial snow at sub-zero temperatures.

 

Tweets.....................................................

This user has reached the maximum allowable queries against Twitter's API for the hour.

360°Panoroma..........................................

panoramafoto-links-normpanoramafoto-rechts-norm
Feuerwehr Suchmaschine
background image
gutschein